Recent IPPTS Methane Stripping Projects
During 2011 we have provided consultancy services in collaboration with Stratus Environmental to WRG (one of the top 5 UK Waste Management Contractors) for retrofitting methane stripping equipment to existing leachate storage tanks at four landfills, and a new centralised leachate discharge facility.
The leachate storage facility is located at the sewer discharge point, and includes additional leachate storage tanks to which leachate which is safe for discharge to the public sewer will be delivered by tanker.
The work was tendered, and awarded as a design and build contract.
IPPTS Associates are providing:
- conceptual design and a reference process design
- tender documents
- tender review and advice on award of contract
- construction stage advice on design aspects
- advice during commissioning.
Completion is due for the early 2012.
|